Monday, August 10, 2009

Air conditioner saga

I initially did not have an air conditioner on our container because the Japanese in Chile warned me from getting an american unit that cannot be serviced in Chile. I also hoped that we could 'get by' but this summer has proven to be a scorcher, and so began the air conditioning saga.


I started with this lousy 8000 BTU unit that I stuck in the vent opening. This thing was only psychologically effective, the temperature did not go down inside at all.


Unit #2 was supposed to be a 14,000 BTU portable unit. After the unit was late by 1 week, I started calling the shipper every 3 hours, and finally decided that Yellow Freight had lost the shipment somewhere in LA. Amazon did finally refund our money.

Unit #3 was an emergency acquisition from Kmart, another 8000 BTU unit, which worked only if you were in line-of-sight. The container is so air tight, that it also caused a serious vacuum in the container, so every time you opened the door, your ears would pop.


And finally, I just in stalled this a couple of days ago, what I should have done 6 months ago, a split, ductless, R410a system. It is actually not that expensive if you install it yourself. It is 24,000 BTU, runs on 208V 60Hz, and is surprisingly quiet, because the compressor is outside.

I installed it just in time for it to get fridgid here, so I haven't really been able to test it in 100 degree weather.

If I installed the refrigeration lines with a leak, then it is legal for me to top off the system with R410a, a non CFC based refrigerant. The only problem is that if we want to run this unit in Chile, we will need a 60-50 Hz frequency converter. I think we might already need one for the water chiller anyway.

New car

Brian traded in his awesome WRX for a brand new WRX STI. If there is any car made for this area, this is it.

I took this photo to make Daniel feel inadequate because he also has a non-STI Subaru, but really, it just makes me feel inadequate to be driving my POS rental.

Saturday, August 8, 2009

counterweights and controller

It has been a week since the last post, so here are some of the things that went on.

First, Brian and I are currently the only people here. There are plenty of ethernet connections now.

Brian and I did a measurement of the imbalance with a heavy duty hydraulic scale. We where able to determine that there are 9000 ft-lbs of imbalance, with the CG toward the shields. It turns out that this measurement comes very close to the measurement from the motor current that Sean came up with. I was hoping for better. I think the reason we are off is because of the baffling, it was just heavier that I estimated.

This imbalance is bad for a couple of reasons. First, I talked to the designer of these drives, and he definitely thought that the friction wheel was not designed to hold that kind of imbalance. Secondly, if the system where to fail, it would end up with the boom down, so not very safe.

To fix the counterweight problem, Brian and I decided to go with Steel. This is after we scambled around looking for lead or other solutions. The OVRO staff told us to go with a welder in Bishop, and they will, source, cut, and deliver our counterweights for $2 a pound, which is not bad. The couterweights will show up on Tuesday, then we have to paint them, and then on Thursday we are having a boom truck come out here to install them. This should get us within a few hundred pounds of balance, and then we can add trim weights.

A second problem that developed has to do with the servo. I think that I burned a chip on the AZ motor controller. Mike sent me an accelerometer so that I could look for resconances in the structure. I was slewing the telescope 360 degrees in 90 seconds, then stopping and turning around. After looking at the accerometer data and trying again, I foind that the Baldor controller was complaing of a low DC bus voltage. These things are suppossed to protect themselves from events like this, so I am not sure how this happenned. After talking with Sean, he decided to get a new unit, and will bring it next week. Until then, we have to move the AZ the old fashioned way, by pushing.

Saturday, August 1, 2009

Track beam problems



Sean came from Richardson TX about ten days ago to start testing out the servo. After some quick initial success, we began to find some problems. The first problem was a velocity limit in el, fixed by reprogramming the motor controllers. The next problem was an oscillation in the position loop in Azimuth. After a couple of days of back and forth with Richardson, they were able to figure out that it was some arcane software lock, which was failing to recognize a hard-wired rate limit. The az appears to now go to a position reliably.

The next step is to tune the parameters, but I am not sure we can do that until I am happy with the balance, more investigation is needed.

The current headache is that we cannot get track beam mode working. This has been anticipated, since SPT had some major issues getting it to work. We seem to make tiny bits of progress every day, but it is slow going because the system is so complex. I spent, for instace, some quality time on the floor of the contiainer fine-tuning some resistors so we could get exacly 10 microsecond pulses. Not fun, but it did appear that we got one baby step closer. The telescope is at least following the scans, and we saw for the first time a basline polarbear scan, 15 degrees back and forth.

We are still not getting any replies from the ACU, so event though the telescope is moving, we would not be able to tell where it is moving without looking at it.

Assembly almost done

The major assembly of the telescope is nearly finished. We have reached the six-week mark, and Albert has left for a week-long trip home. We hope to have everything done in two weeks.


Marius left for home a couple of weeks ago, and was replaced by Nathan, but here is an old photo of Marius painting the saddlebags. He and Dave took a lot of abuse for how they went from space-qualifies looking before the paint job to little rascals clubhouse looking after the paintjob, but the automotive paint will do the job, and it was a pretty smelly and messy job. I still think that Marius has some paint on him somewhere. The saddlebags are now installed, thanks to a very careful layout job from Brian and some help from Mike with the forklift. I am afraid that we will need a taller ladder to reach these saddlebags.



The baffles have been slowly going on for the last couple of weeks. The panels go on like a complicated 3D puzzle, where each piece had to be slightly trimmed to fit. "Tony" got a lot of grief for this job also.


We had one baffle casualty when a dust devil caught a sheet before it was fully attached. The sheet metal was somewhat mangled, but they banged it back into shape and I think it is okay for now. I will request a new one when more baffles are being made.



The last major piece went in a couple of days ago when we finally installed the cryo mass dummy. Al decided to install the frame first, then the ballast weight second. You can just barely see the Pullz-all that we used to hoist things into place. The manlift stood in for the eventual gantry that needs to be made here (80/20 Marius?).

Tony did not get any credit for how everythign fit together on the first try, because Tony did not fabricate these parts.


Here you can see the weights installed. It is a little scary to stand right below these weights, so I dont recommend it.


Here is how the telescope looks now.The look is basically how it will be for the next few months. A few more panels need to fabricated aroud the secondary, and an enclosure the the reciver will need to go on, but it wont look much different.


With the assembly winding down, I am trying to figure out the exit strategy. Of course, the major outstanding item is the servo, more on that later. Brian will be working refining the secondary adjuster of the next week, and I think that we will need substantially more counterweight, we seem to be heavy toward the lower boom, but I am not quite sure yet.

Fire and rainbows

This is still me playing catch up. There were a couple of days of crazy forrest fires, started by lightning. We could not weld those days. You could see the smoke from pretty far away, even from my Super-8. As it turns out, the fire was on Brian's front door, and he was evacuated. He toughed it out for two days in the campgrounds.



It has rained probably half of the days during the six weeks we have been here. The Cedar Flat site has only been operational for a few years, and they have never seen anything like it. They are blaming it on El Nino. We caught this impressive double rainbow over Polarbear late one afternoon.

Photo catch up

This is a catch up post showing some photos during the week of photogrammetry. It feels like ancient history now, so much has happened since then, but here goes.

Brian was in charge of placing most of the targets. Not too close, and every shot needs at least 3 'coded' targets to situate the photo. The rest of the spots are the actual targets. The first round also needs an "iron cross" to define the inital coordinates, and scale bars to define the scale. The process is somewhat magical, but if you think about it hard enough, it makes sense. The whole setup costs ~$200K and requires a significant amount of training to get it perfect, but they claim better that 0.001" accuracy.






There is a photogrammetry rhythm that is followed every night. It starts with making adjustments to the secondary, then waiting until the telescope thermalizes, then riding around in the manlift and taking abotu 100 shots over about 270 degress around the telescope. Here's a photo as the sun is sinking far below the horizon. Jay is messing with something, and Brian is adjusting some panels before we start.



We foolishly operated with the doors open most of the time, to keep things cool. Marius's fly traps have been redeemed, and there is a now a disgusting rogues gallery of bugs stuck to one of the traps. The liquid trap is still empty.


At least one night was actually clear enough to see starts. Most nights were cloudy and rainy.



This is an early photo of the targets. By the end, we had many more targets so I could check the warp in the panels.


I saw the sunrise on many occations. This will probably be the first out of hundreds, so get ready.