Brian has spent the last few days repainting the entire structure. It took 5 gallons of paint, and we only have about a quart left for touch ups. The original plan was to just touch up the structure, but it made it look too uneven, so we decided to go all way. We will see how nice it looks in 6 mo after we have had our grubby hands all over it.
This was some special two part epoxy paint-Interthane 990HS. I hear that it cost a lot of money, and it smelled really awesome.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment